forked from jsnbuchanan/crowd-funder-for-time-pwa
Replace static databaseUtil import with dynamic import pattern for test context. Add comprehensive JSDoc documentation and improve code formatting. Maintains functionality while removing static dependency.
3.2 KiB
3.2 KiB
deepLinks.ts Pre-Migration Audit
Service Overview
- File:
src/services/deepLinks.ts - Purpose: Deep link handler service for processing and routing deep links in TimeSafari app
- Complexity: Medium (260 lines)
- Migration Priority: High (Services category)
Current State Analysis
Phase 1: Database Migration Assessment
- Status: ⏳ NEEDS MIGRATION
- Issues Found:
- Uses
logConsoleAndDbfrom../db/databaseUtil(line 52) - 3 instances of
logConsoleAndDbusage (lines 175, 237, 246)
- Uses
Phase 2: SQL Abstraction Assessment
- Status: ✅ NOT NEEDED
- Evidence: No SQL operations found
- Actions Required: None
Phase 3: Notification Migration Assessment
- Status: ✅ NOT NEEDED
- Evidence: No notification usage found
- Actions Required: None
Phase 4: Template Streamlining Assessment
- Status: ✅ NOT NEEDED
- Evidence: No template code found (service file)
- Actions Required: None
Technical Analysis
Database Operations
// Legacy databaseUtil usage
import { logConsoleAndDb } from "../db/databaseUtil";
logConsoleAndDb(`[DeepLink] Invalid route path: ${path}`, true);
logConsoleAndDb("[DeepLink] Processing URL: " + url, false);
logConsoleAndDb("[DeepLink] Error processing deep link:", error);
Code Complexity
- Lines: 260 lines
- Functions: 1 main class (DeepLinkHandler)
- Imports: 4 imports including legacy patterns
- Database Operations: 3 logging calls
- Notification Usage: None
Key Functions Requiring Migration
validateAndRoute(line 175): Database migration neededhandleDeepLink(line 237, 246): Database migration needed
Migration Plan
Phase 1: Database Migration
-
Replace Legacy Imports
- Remove
logConsoleAndDbimport - Replace with logger utilities
- Remove
-
Update Logging Operations
- Replace
logConsoleAndDbcalls withlogger.errororlogger.info - Maintain proper tagging:
[DeepLink]
- Replace
Phase 2: SQL Abstraction
- No Action Required
- No SQL operations found
Phase 3: Notification Migration
- No Action Required
- No notification usage found
Phase 4: Template Streamlining
- No Action Required
- No template code found
Estimated Migration Time
- Phase 1: 5-10 minutes
- Phase 2: 0 minutes (not needed)
- Phase 3: 0 minutes (not needed)
- Phase 4: 0 minutes (not needed)
- Total Time: 5-10 minutes
Risk Assessment
- Low Risk: Simple service file with only logging operations
- Breaking Changes: None (logging modernization only)
- Performance Impact: Minimal (enhanced logging)
Success Criteria
- Legacy databaseUtil imports removed
- logConsoleAndDb calls replaced with logger utilities
- Proper logging tags maintained
- Linting passes with no errors
- Service functionality preserved
Migration Notes
- Simple service file requiring minimal migration
- Only logging operations need updating
- No complex database or notification patterns
- Service is critical for deep link handling
Audit Date: 2024-12-19 Auditor: Migration System Status: Ready for Phase 1 migration only