You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
3.1 KiB
3.1 KiB
EntityGrid.vue Migration Audit
Component Overview
- File:
src/components/EntityGrid.vue
- Size: 291 lines (Medium Complexity)
- Purpose: Unified grid layout component for displaying people and projects with selection
- Migration Target: Enhanced Triple Migration Pattern
Migration Status: ⏳ READY FOR MIGRATION
Pre-Migration Analysis
- Database Operations: ✅ No databaseUtil imports found (pure UI component)
- SQL Queries: ✅ No raw SQL queries found
- Notification Usage: ✅ Uses prop-based notification system (modern pattern)
- Template Complexity: ⏳ Needs Phase 4 (Template Streamlining)
Migration Requirements
- ✅ Phase 1: Database Migration - NOT NEEDED (no database operations)
- ✅ Phase 2: SQL Abstraction - NOT NEEDED (no raw SQL)
- ✅ Phase 3: Notification Migration - NOT NEEDED (already modern)
- ⏳ Phase 4: Template Streamlining - NEEDED (long CSS classes)
Component Features to Migrate
- Grid Layout: Responsive grid for people/projects display
- Special Entities: "You" and "Unnamed" entity integration
- Conflict Detection: Integration with conflict checking system
- Empty States: Conditional empty state messaging
- Show All Navigation: Conditional navigation card
- Event Delegation: Entity selection event handling
- Responsive Design: Platform-specific grid layouts
Technical Analysis
- Database Operations: None (pure UI component)
- Notification System: Uses prop-based
notify
function (modern pattern) - Template Classes: 1 long CSS class that can be extracted
- Methods: 4 methods with good documentation
- Computed Properties: 8 computed properties (well-structured)
- Props: 12 props with proper TypeScript typing
Migration Complexity Assessment
- Database Migration: Low (no database operations)
- SQL Abstraction: Low (no raw SQL)
- Notification Migration: Low (already modern)
- Template Streamlining: Low (1 long class to extract)
- Overall Complexity: Low
Estimated Migration Time
- Conservative Estimate: 4-6 minutes
- Optimistic Estimate: 2-3 minutes
- Based on: Simple template streamlining, good existing structure
Risk Assessment
- Risk Level: Low
- Potential Issues: None identified
- Dependencies: PersonCard, ProjectCard, SpecialEntityCard, ShowAllCard
- Testing Requirements: Grid layout, entity selection, responsive behavior
Migration Strategy
- Phase 4 Focus: Extract long CSS class to computed property
- Documentation: Enhance existing documentation
- Template Cleanup: Improve template readability
- Validation: Ensure grid functionality remains intact
Success Criteria
- ✅ All long CSS classes extracted to computed properties
- ✅ Template complexity reduced
- ✅ Grid functionality preserved
- ✅ Entity selection preserved
- ✅ Responsive behavior maintained
- ✅ Lint validation passes
Next Steps
- ⏳ Begin Phase 4 (Template Streamlining)
- ⏳ Extract CSS class to computed property
- ⏳ Update documentation
- ⏳ Validate functionality
- ⏳ Create migration completion document