You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
3.2 KiB
3.2 KiB
deepLinks.ts Pre-Migration Audit
Service Overview
- File:
src/services/deepLinks.ts
- Purpose: Deep link handler service for processing and routing deep links in TimeSafari app
- Complexity: Medium (260 lines)
- Migration Priority: High (Services category)
Current State Analysis
Phase 1: Database Migration Assessment
- Status: ⏳ NEEDS MIGRATION
- Issues Found:
- Uses
logConsoleAndDb
from../db/databaseUtil
(line 52) - 3 instances of
logConsoleAndDb
usage (lines 175, 237, 246)
- Uses
Phase 2: SQL Abstraction Assessment
- Status: ✅ NOT NEEDED
- Evidence: No SQL operations found
- Actions Required: None
Phase 3: Notification Migration Assessment
- Status: ✅ NOT NEEDED
- Evidence: No notification usage found
- Actions Required: None
Phase 4: Template Streamlining Assessment
- Status: ✅ NOT NEEDED
- Evidence: No template code found (service file)
- Actions Required: None
Technical Analysis
Database Operations
// Legacy databaseUtil usage
import { logConsoleAndDb } from "../db/databaseUtil";
logConsoleAndDb(`[DeepLink] Invalid route path: ${path}`, true);
logConsoleAndDb("[DeepLink] Processing URL: " + url, false);
logConsoleAndDb("[DeepLink] Error processing deep link:", error);
Code Complexity
- Lines: 260 lines
- Functions: 1 main class (DeepLinkHandler)
- Imports: 4 imports including legacy patterns
- Database Operations: 3 logging calls
- Notification Usage: None
Key Functions Requiring Migration
validateAndRoute
(line 175): Database migration neededhandleDeepLink
(line 237, 246): Database migration needed
Migration Plan
Phase 1: Database Migration
-
Replace Legacy Imports
- Remove
logConsoleAndDb
import - Replace with logger utilities
- Remove
-
Update Logging Operations
- Replace
logConsoleAndDb
calls withlogger.error
orlogger.info
- Maintain proper tagging:
[DeepLink]
- Replace
Phase 2: SQL Abstraction
- No Action Required
- No SQL operations found
Phase 3: Notification Migration
- No Action Required
- No notification usage found
Phase 4: Template Streamlining
- No Action Required
- No template code found
Estimated Migration Time
- Phase 1: 5-10 minutes
- Phase 2: 0 minutes (not needed)
- Phase 3: 0 minutes (not needed)
- Phase 4: 0 minutes (not needed)
- Total Time: 5-10 minutes
Risk Assessment
- Low Risk: Simple service file with only logging operations
- Breaking Changes: None (logging modernization only)
- Performance Impact: Minimal (enhanced logging)
Success Criteria
- Legacy databaseUtil imports removed
- logConsoleAndDb calls replaced with logger utilities
- Proper logging tags maintained
- Linting passes with no errors
- Service functionality preserved
Migration Notes
- Simple service file requiring minimal migration
- Only logging operations need updating
- No complex database or notification patterns
- Service is critical for deep link handling
Audit Date: 2024-12-19 Auditor: Migration System Status: Ready for Phase 1 migration only