deepLinks.ts Pre-Migration Audit

Service Overview

  • File: src/services/deepLinks.ts
  • Purpose: Deep link handler service for processing and routing deep links in TimeSafari app
  • Complexity: Medium (260 lines)
  • Migration Priority: High (Services category)

Current State Analysis

Phase 1: Database Migration Assessment

  • Status: NEEDS MIGRATION
  • Issues Found:
    • Uses logConsoleAndDb from ../db/databaseUtil (line 52)
    • 3 instances of logConsoleAndDb usage (lines 175, 237, 246)

Phase 2: SQL Abstraction Assessment

  • Status: NOT NEEDED
  • Evidence: No SQL operations found
  • Actions Required: None

Phase 3: Notification Migration Assessment

  • Status: NOT NEEDED
  • Evidence: No notification usage found
  • Actions Required: None

Phase 4: Template Streamlining Assessment

  • Status: NOT NEEDED
  • Evidence: No template code found (service file)
  • Actions Required: None

Technical Analysis

Database Operations

// Legacy databaseUtil usage
import { logConsoleAndDb } from "../db/databaseUtil";
logConsoleAndDb(`[DeepLink] Invalid route path: ${path}`, true);
logConsoleAndDb("[DeepLink] Processing URL: " + url, false);
logConsoleAndDb("[DeepLink] Error processing deep link:", error);

Code Complexity

  • Lines: 260 lines
  • Functions: 1 main class (DeepLinkHandler)
  • Imports: 4 imports including legacy patterns
  • Database Operations: 3 logging calls
  • Notification Usage: None

Key Functions Requiring Migration

  1. validateAndRoute (line 175): Database migration needed
  2. handleDeepLink (line 237, 246): Database migration needed

Migration Plan

Phase 1: Database Migration

  1. Replace Legacy Imports

    • Remove logConsoleAndDb import
    • Replace with logger utilities
  2. Update Logging Operations

    • Replace logConsoleAndDb calls with logger.error or logger.info
    • Maintain proper tagging: [DeepLink]

Phase 2: SQL Abstraction

  1. No Action Required
    • No SQL operations found

Phase 3: Notification Migration

  1. No Action Required
    • No notification usage found

Phase 4: Template Streamlining

  1. No Action Required
    • No template code found

Estimated Migration Time

  • Phase 1: 5-10 minutes
  • Phase 2: 0 minutes (not needed)
  • Phase 3: 0 minutes (not needed)
  • Phase 4: 0 minutes (not needed)
  • Total Time: 5-10 minutes

Risk Assessment

  • Low Risk: Simple service file with only logging operations
  • Breaking Changes: None (logging modernization only)
  • Performance Impact: Minimal (enhanced logging)

Success Criteria

  • Legacy databaseUtil imports removed
  • logConsoleAndDb calls replaced with logger utilities
  • Proper logging tags maintained
  • Linting passes with no errors
  • Service functionality preserved

Migration Notes

  • Simple service file requiring minimal migration
  • Only logging operations need updating
  • No complex database or notification patterns
  • Service is critical for deep link handling

Audit Date: 2024-12-19 Auditor: Migration System Status: Ready for Phase 1 migration only