You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
 
 
 
 
 
 

25 lines
5.3 KiB

id&qtp&qim&qil&qtx&qca&qia&qrm&qnxt&qprv&qalb&subj&wght&pts&flr&ded&layout&qfixed&qptsbyans&flags
srv2.001&mcs&0&Y&Which is NOT a critical customer requirement or component in the IBM eServer Advantage?&Strategic Intervention&Innovative Technology;Application Flexibility;New Tools for Managing e-business;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.002&mcs&0&Y&The names of the four e-business IBM eServers are:&xSeries, zSeries, iSeries, and pSeries&aSeries, bSeries, cSeries, and dSeries;tSeries, xSeries, ySeries, and zSeries;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.003&mcs&0&Y&IBM has fully embraced which open industry standard to enable application flexibility?&Linux&COBOL;Assembler;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.004&mcs&0&N&Which of the following terms describes the solutions and services used to plan, build, and maintain an environment that supports multiple applications to meet business needs of organizations that have both traditional and Web-based business models?&on-demand infrastructure&IBM Solutions and Support;business foundation;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.005&mcm&0&N&Which of the following contribute to the growth of on-demand infrastructure?&Economics;Technology;&Environmental concerns;&&&&a&undefined.0&&&&&1&&&N.
srv2.006&mcm&0&N&Which of the following are tasks you might perform when designing an IBM on-demand infrastructure solution?&Connect to existing data and transaction servers;Identify Edge Server workloads;Select Web Application Server platform;&&&&&a&undefined.0&&&&&1&&&N.
srv2.007&tf&0&N&True or False? <br><br>Project eLiza formalizes self-management efforts across all IBM products and focuses on the common goal of building on the automated management function to create self-managing systems.&TRUE&FALSE&&&&&undefined.0&&&&&1&&&N.
srv2.008&mcm&0&Y&Which of the following does Workload Manager do?&Improves batch throughput;Improves businesses' quality of service;&Increases the TCO for zSeries ;&&&&a&undefined.0&&&&&1&&&N.
srv2.009&mcm&0&Y&Which of the following are security features of the zSeries?&Virtual Private Network;Hardware-assisted cryptography;&Workload consolidation;&&&&a&undefined.0&&&&&1&&&N.
srv2.010&tf&0&Y&Linux on zSeries is attractive to businesses because of its low TCO.&TRUE&FALSE&&&&&undefined.0&&&&&1&&&N.
srv2.011&mcm&0&Y&Which of the following pSeries server characteristics are well-suited to complex scientific data management?&Packaging preferences;Configuration flexibility;Competitive positioning;&&&&&a&undefined.0&&&&&1&&&N.
srv2.012&mcs&0&Y&Which of the following is the IBM internal benchmark for comparisons of all of the pSeries servers?&rPerf&FastBench;SPEC SFS97;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.013&mcm&0&Y&Which of the following pSeries servers are well-suited for complex scientific data management?&p680-S85;p690-681;&p660-6M1;&&&&a&undefined.0&&&&&1&&&N.
srv2.014&mcs&0&Y&What was the characteristic that defined the 70's and early 80's in the evolution of IT solutions?&Software industry established&Compatible computers;Computers became mainstream;Same solution offered across different platforms;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.015&mcm&0&Y&Which of the following are characteristics that businesses should expect from a server?&Security;Performance;Reliability;Scalability;&&&&&a&undefined.0&&&&&1&&&N.
srv2.016&esa&0&Y&iSeries provides value that would require more resources with NT or UNIX therefore, it is a better _______________.&ROI;return on investment&&&&&&undefined.0&&&&&1&&&N.
srv2.017&mcm&0&Y&Which of the following are types of xSeries server products?&Point Solution Server;Universal Servers;&High Capacity Solution Servers;&&&&a&undefined.0&&&&&1&&&N.
srv2.018&mcs&0&Y&How many nodes can a Datacenter Solutions cluster have?&Four&Two;Three;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.019&esa&0&Y&__________ is a CD-based collection of software tools that ensures a reliable, consistent installation and configuration.&ServerGuide;Server Guide&&&&&&undefined.0&&&&&1&&&N.
srv2.020&tf&0&Y&True or False? Previously, all the infrastructure you needed was a PC connected to the Web with IT support. Now, you must optimize your infrastructure in order to be successful.&TRUE&FALSE&&&&&undefined.0&&&&&1&&&N.
srv2.021&mcm&0&Y&Which of the following are examples of how IBM is optimizing servers to meet the needs of the evolving customer environment?&IBM is the only vendor offering vertically scalable servers optimized for all workload classes. ;IBM pioneered the use of copper wiring to replace aluminum, providing increased speed.;IBM introduced SOI chips that create a new insulating layer in the silicon, boosting performance. ;&&&&&a&undefined.0&&&&&1&&&N.
srv2.022&mcs&0&Y&The IBM eServer family consists of four product lines. Which server series provides the most reliable, mission critical data transaction servers available?&zSeries&iSeries;xSeries;pSeries;&&&&a&undefined.0&&&&&1:v&&&N.
srv2.023&tf&0&Y&True or False? The on-demand business environment is about integration, connection, and linkage.&TRUE&FALSE&&&&&undefined.0&&&&&1&&&N.
srv2.024&mcm&0&Y&What steps should you take before selecting a server strategy for a customer?&Consider the possibility of future growth for the customer and the change of project requirements.;Understand the project needs, including cost, implementation, and packaging preferences.;Evaluate the customer's skills and infrastructure.;Review the customer's specific application needs.;&&&&&a&undefined.0&&&&&1&&&N.